Control Drawings and Revisions.
Control construction drawings with drawing number, title, discipline, revision, status, review, approval, history, viewer, and project linkage — so site teams always work from the right revision.
What it does
Revision control for site drawings.
- Register drawings with number, title, discipline, revision, and status.
- Upload, review, approve, or send back for revision.
- Keep full drawing history so older revisions remain traceable.
- Support viewing and PDF/CAD handling where available.
- Issue drawings through controlled project workflows and transmittals.
Connections
How it links across the OS.
- Lives inside Project 360 design/drawing tabs.
- Works with document management for related controlled files.
- Approvals govern what becomes the issued revision.
- Activity history shows who uploaded or approved a drawing and when.
- Client portal can expose approved drawings where configured.
Problems it addresses
Familiar construction friction.
- Site teams build from outdated PDF copies in WhatsApp.
- Revision R3 and R4 circulate at the same time.
- Nobody can prove which drawing was issued when.
- Document controllers struggle to answer audit questions.
Benefits
What teams gain.
- One controlled place for current and past revisions.
- Clear approval status before drawings reach site.
- Faster answers during RFIs and site disputes.
- Less rework caused by wrong revision use.
Features
Drawings capabilities
Practical construction controls — not generic feature fluff.
Drawing register
Drawing number, title, discipline, revision, status, and project linkage.
Review and approval
Upload, review, approve, reject, or request revision with history.
Viewer and history
Open drawings in a viewer layout with properties and revision panel.
Transmittals
Issue drawings in a controlled way to the people who need them.
Three-pane workspace
Drawing tree, viewer, and properties/revision panel for document controllers and engineers.
Drawing control
Revision discipline for document controllers and site teams.
Stop building from the latest WhatsApp PDF. Keep number, discipline, revision, status, approval, history, viewer layout, and transmittals in one register.
Three-pane workspace
Drawing tree, viewer, and properties/revision panel for faster control-room work.
Review and approval
Upload, review, approve, reject, or request revision with a clear history trail.
Transmittals
Issue the right revision to the people who need it — not every chat group.
Related guides
Read more about drawings in construction ERP.
See Drawing Management on your projects.
Book a demo and we will walk the workflows your teams care about — with project context intact.